Indicative design render of the Greenwave Circularity recycling facility

Closing India’s plastic loop, at industrial scale.

Greenwave Circularity is building a food-grade PET recycling facility in Odisha and returning post-consumer plastic to the products it came from.

Indicative design render

The context

India consumes plastic faster than it can recover it.

India generates roughly 26,000 tonnes of solid waste every day. Around 40% of it is never collected. Meanwhile national demand for recycled content is rising sharply, driven by regulation, brand commitments and consumer expectation. The gap between what India discards and what it can return to use is the largest single opportunity in the country’s materials economy.

26,000 tonnes

solid waste generated in India every day

~40%

never formally collected

9.8%

CAGR of India's plastic recycling market to 2032

The facility

A fully integrated recycling facility in Odisha.

Food-grade rPET

Post-consumer bottles converted to flakes, resin and preforms, produced to food-contact standard.

Recycled polyolefins

7,000 MTPA of rPP and rHDPE, extending circular supply into packaging, automotive and construction.

Built for the lowest footprint in its class

Zero liquid discharge with over 90% of water reprocessed at full operational capacity across three development phases, minimal chemical use, rooftop solar and heat recovery.

Isometric render of the Greenwave recycling facility and site layout
Indicative design render: site and plant layout
Front elevation render of the Greenwave recycling facility
Indicative design render: front elevation

The loop

From bottle to bottle, designed to begin again.

  1. 01

    Collection

    Bottles recovered through India's waste collection network

  2. 02

    Sorting

    Aggregation and grading at material recovery facilities

  3. 03

    Recycling

    Washing, flaking and polymerisation into food-grade resin

  4. 04

    Preform

    Resin converted into preforms for bottling

  5. 05

    Return to use

    Filled, sold, and recovered again

The same material, returned to the same use, again and again.

Impact

Measured in material, carbon and livelihoods.

Figures represent full operational capacity across three development phases.

10 billion
post-consumer bottles recovered annually at full scale
~75%
lower carbon footprint than virgin PET
1,000
direct and indirect formal jobs across operations, maintenance, logistics and downstream value chains
140,000+
informal waste workers whose income streams are formalised
Visitors and workers inspecting recycling machinery inside an operating facility
Technical visit to an operating recycling facility

The people

An industry for work that already exists.

India’s recycling economy already runs on hundreds of thousands of collectors, sorters and aggregators who work without contracts, without protection and without record. Greenwave’s supply chain brings that work into a documented and audited system with traceable material, formal income, and recognised employment. Our social impact programme is implemented in partnership with Ecoloom Greentech.

Partnership

Financed to international standards.

Greenwave Circularity is financed by OeEB, the Development Bank of Austria, under a guarantee of the European Union. Development finance of this kind is directed at projects that are strategically important before they are commercially proven. This is capital that arrives ahead of conventional lending.

OeEB

Development Bank of Austria; project finance guaranteed by the European Union

Moon Beverages

Captive offtake partner, India's third-largest Coca-Cola bottling group

Jainarain Fabtech

Feedstock sourcing partner, nine years in PET recycling

Project representatives presenting a framed document at an Odisha investment engagement
Project engagement with institutional stakeholders in Odisha
Project representatives at an institutional meeting in Odisha
Institutional engagement in Odisha

Institutional backing

Financing and institutional partners.

  • OeEB, Development Bank of Austria

    OeEB

  • European Union

    European Union

  • EU Global Gateway

    EU Global Gateway

  • European Development Finance Institutions

    EDFI

Standards

Target certifications and compliance frameworks.

Greenwave intends to build and operate against internationally recognised environmental, safety, quality and food-contact frameworks.

All marks shown are targets. Greenwave is not currently certified under these frameworks.

Construction and management

  • LEED Gold mark

    LEED Silver/Gold

  • IFC Performance Standards framework

    IFC Performance Standards

  • ISO 9001 mark

    ISO 9001

  • ISO 14001 mark

    ISO 14001

  • ISO 45001 mark

    ISO 45001

  • ISO 22000 mark

    ISO 22000

Operations and product

  • FSSAI mark

    FSSAI

  • Global Recycled Standard mark

    Global Recycled Standard

  • US Food and Drug Administration mark

    US FDA food-contact

  • European Food Safety Authority mark

    EFSA

  • EN 15343 mark

    EN 15343

  • RecyClass mark

    RecyClass

  • REACH compliance mark

    REACH

  • SMETA 4-Pillar mark

    SMETA 4-Pillar

Operational certifications are targeted within 3–9 months of commercial production.

Sustainable Development Goals

Aligned to thirteen Sustainable Development Goals.

The facility connects circular production and resource efficiency with formal livelihoods, safer work and international partnership, linking industrial infrastructure to wider social and environmental outcomes.

Thirteen United Nations Sustainable Development Goals aligned with the Greenwave project: goals 1, 3, 5 through 14, and 17

Progress

Khordha, Odisha.

The site is secured and demarcated. Ground plotting is complete and construction is underway.

Site plan render of the Greenwave Circularity facility in Odisha
Indicative design render: site plan
Excavator and concrete plotting pillars on the Greenwave project site
Ground demarcation
Early plotting works and site markers across the Greenwave project land
Early plotting works
Greenwave project site cabin and electrical infrastructure
Site infrastructure
Project delegation visiting the Greenwave site in Odisha
Project delegation at the Odisha site

Talk to us about supply, offtake or partnership.

Get in touch